From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
DONALD W. BURKS MESQUITE, TX
75149 dnld_brks@yahoo.com 972/971-8651 (CELL) EXPERIENCE: Field
Tech Band wireless/Sprint Foxborough,
MA October
2015-December 2015 Sprint Gillette stadium DAS
project. Responsible for the complete installation of the equipment
room. Install all new custom ladder racks and
cable tray in overhead. Fabricate and custom build equipment racks for
1900 and new 2.5 modules. Complete installation of all radios with power
grounding and fiber terminations. Installation of all Alcatel-lucent DAS
racks and pertinent equipment. Installation of BBU power plants and all power
runs to equipment. Installation of all custom RF cables with Andrews
connectors from radios to DAS equipment. Field
Lead Band wireless/T-Mobile Dallas,
TX August
2014-September 2015 T-Mobile modernization phase 2 field Lead.
Responsible for supervising general contractor installation of Nokia Flexi
1900/2100 and 700. Help support of LTE integration. Work with and train
GC onsite on proper handling and Delivery of equipment cover NTP and map out
game plane of task. Training GC on Anritsu for all RF sweep standards. Submit photos and daily report on site
implementation progress. Field
Manager Fusion Solutions/NSN Dallas,
TX October
2012-January 2014 T-Mobile modernization project field
manager. Responsible for supervising multiple general contractor teams,
performing BTS site implementation of new LTE equipment to be installed in
integrated according to T-Mobile safety and quality standards, travel to job
sites, track individual and team performances, organize and prioritize daily
objectives, manage team to achieve scheduled goals, oversee during
construction of tower and civil portion, perform site walks, daily reports
and communicate with superiors and customer. Distribute and cover RDFS
NTP and site drawings with crew leads. Field
Engineer Oxford/Cricket Houston,
San Antonio, Austin, TX February
2012-October 2012 A multitasking position that requires
tagging and Fulcruming Huawei LTE sites for audit, test and troubleshoot T-1 circuits with Acterna
HST-3000 T-berg. Doing swaps and cutover from Nortel to Ericsson LTE, install jumpers add
connectors perform sweeps with Anritsu MS2721B E911 call testing and documentation Technician
Teksystems/Huawei Dallas,
TX December2011-February
2012 Installed Huawei 8800 optical frames in
Central office, run and terminate fibers for equipment. Installed Huawei RRU
equipment for wireless LTE and UMTS Pole mount modules, run and
terminate power from equipment to BBU. Run and terminate and test fibers. Build
and install custom frames for Huawei switches, run all power and cat-6 cable
to equipment Technician
Adex/Sprint Dallas,
TX November
2011-December 2011 Duties consisted of installation of Nortel
switch with chassis and frame in Sprint BSC-CPDS Central Office switch in
Dallas,Tx. Installation of Ericsson SE 1200 4-G router with frame, run
and terminate all power from equipment to BDFB, run and terminate all fibers
and test, wire wraps and punch-downs Field
Tech Avion/ AT&T Roswell,
NM August
2011-October 2011 Duties consisted of performing cut over
from Verizon UMTS to Ericsson CDMA 3G GSM equipment in AT&T Microwave
Ultra cell sites. Commission and integrate RF cabling and systems; test and
troubleshoot circuits on GSM. Call test all sectors 2G / 3G perform data
testing and E911, document and report of all activities Field
Lead Tech Insight/DART Dallas,
TX February
2011-July 2011 Manage Dallas Area Rapid Transit light rail
platform stations for installation of Cisco HD 4500. My job duties consisted of discovery work
for cat.6 and fiber pulls and termination. Installation of 4500, 2500 and 2530 units
and installation of network switches and PDU power base Engineering of sight layouts and drawings
of station platforms, troubleshoot, site redesign and Focus, network configuration and
integration, reporting and documentation Technician
Mycom /T-Mobile Minneapolis,
MN / St. Louis, MO March
2010- January 2011 Install Nokia FSMB expansion modules,
perform swaps and install FPAA rectifier, run Ethernet and alarm
cables. Update software and run scripts, test t-1 and ID new circuits,
integrate and commission equipment, call test and troubleshoot. High levels
of documentation and reporting of all daily tasks Technician
Mycom /T-Mobile Denver,
CO /Kansas City, MO July
2009- February 2010 Inventory deliver and install Nokia FLEXI
equipment for T-Mobil, build FCOA pole mounts and RRU setup. Run all fiber
optic cables; Pull T 1’s RJ45 connect. OVPconnection. Installed batteries.perform
sweeps, T-1 testing and troubleshoot, call testing commission and integrate
cell site troubleshooting for any unexpected problems Technician
Betacom/AT&T Tampa,
Miami, FL August
2008- Febuary 2009 Deliver and install Ericsson 850
RXAIT Ericsson MCPA Ericsson UMTS and Ericsson 1900 RXAIT,
run and labal all power cables, pull and test T-1 with FLUKE. mount external
alarm unit,run labal and connect jumpers T-berg sweeps and record keeping,
equipment inspection, punch-down alarms Installed batteries and run battery
strings Installer
EXi parsons/ AT&T Alabama/Mississippi May
2008-August 2008 Deliver and equipment inspection Installed Ericssons RBS 3206 UMTS equipment
in AT&T cell sites ,run and labal all power cables,mount external alarm
unit,run labal and connect jumpers Technician
1- TNS/OrinUSA/T-Mobile Houston,
Texas October
2007 – May 2008 Install FLEXI for 2-G Edge and 3-G
Technology; Build FCOA, H-frame, RRU pole mount kits and mini Purcel;
Improvise and build many custom sites; Run all fiber optic cables; Pull T 1’s
from NIU to surge location test and ID circuits; Connect power in the BBU;
Connect and weather-proof all jumpers with surge arresters; Integrate and
commission; Complete close-out package with documentation and photos Installer-Crest
Point/AT&T Texas/Louisiana July
2007-September 2007 Installed Cisco and Juniper routers in
AT&T central offices per TP76300 standards; understand and Read SPEC and
all daily activities in accordance with MOP; mount racks and cable mngmnt. on
raised floors; Installed equipment bays; Ran and punch down cat 5/and 6
cables fibers and all coax; Ran power in ladder rack and raised floor
connected all lugs and terminated power cables in BDFB power plant HS1-Zero
Chaos/Nortel Networks/Sprint/Cricket Dallas/Houston,
Texas August
2006 – June 2007 Program and run scripts on DOM-A; Perform
swaps; Installed and troubleshoot T 1’s; Integrate and commission BTS mini
metro cells for Cricket/Sprint; Integrate EVDO; Installed batteries and run
battery strings using GUI software; Installed SFRM radios and duplexers &
triplexers; Cabling of all core network hardware per A, B, C, D or E kits;
Connect, run, and weather-proofed all jumpers; Site surveys with full
documentation and photos per Nortel Network protocol TDMA
Technician-OrinUSA/Betacom/Cingular Tampa,
Florida February
2006 – September 2006 TP76300 certified tester for Ericsson RBS
equipment installed radios and switch mode kits in Ericsson equipment TDMA;
Installed MCPA Harley and Cobra racks; Connect all jumpers and T1’s; work
well in all power plants with #2, #4, and #6 cable; Connect and punch down
alarms; Install ladder racks and installed bus-bar with Cadweld; Uninstalled
old Lucent equipment Nokia and Nortel BTS
Engineer – Unlimited Lynx, Inc./Cingular Philadelphia,
Pennsylvania May
2005 – November 2005 Excellent professional track record for
positions in BTS engineering and installation; Highly capable of managing
projects to commission and integrate RF cabling and systems; Proven ability
to train and support technical employee teams in site layout and
quality;Extensive expertise with equipment inspection,expansions, adds,
swaps, and overlays; Versed in Nokia and Ericsson equipment, RF cabling,
T-Berg operation, and schematics; Recognized as a creative and effective
technical tester, troubleshooter, and problem solver; Strong communication,
documentation, and reporting skills with people at all levels; Possess
outstanding; organizational skill, multitasking ability, and attention to
detail; Resourceful coordinator, thinker, and leader in fast-paced
telecommunications settings Project
Coordinator - Sarcom Dallas,
Texas January
2000 – December 2000 Installed and configured computer cabinets
for 600Mhz Compaq Proliant Server; Installed Window NT on each server and
updated with NTSP4; Connected Cisco 2600 Routers to Cisco 2900 10/100 MBPS
switches; Upgrades to hotel network using Sniffers and Punch-down Butt sets;
Upgrades enabled internet connection in any room in the hotel at a high speed
through the T1-DemarC; Prepped client workstations for conversion; Installed
applications, set up network printers, set up user profiles and performed
troubleshooting for any unexpected issues during the conversion; Maintain contact
with chief engineer and general management with conversion/production
updates; Meet and maintain service level statistics as established; Provide
ISP Support for connectivity issues; Provide IT Support CERTIFICATIONS: Nokia 4G LTE Certification HS 1 Certification TR76300 Certification Nokia Level 1 Certification DC Power Plant Certification Andrews Certification Safety Certification Forklift license Flexi installation Certification REFERENCES: Bill Newburn NSN Lead field
Manager 214-551-2679 Armando Menchaca Network Operations
Manager 210-859-1978 Troy Richardson NSN
Modernization Project Manager 214-710-6674 Joe McCall Crown Castle
Construction Manager 214-684-0366 |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|